LED screen delivery terms determine where the seller’s transport obligation ends, when transport risk transfers, and which party handles export or import formalities. A cabinet price alone cannot tell an overseas buyer what the equipment will cost at the installation site. Ask every bidder to name the Incoterms® 2020 rule and the precise named place, then price the remaining freight, clearance, tax, unloading, and local delivery on the same basis.
This guide is for an overseas project buyer comparing equipment proposals before placing an order. It explains the commercial questions to put on a quote; the agreed sales contract and the current ICC rules control the parties’ actual obligations. No freight rate, duty rate, or promise of a particular shipping service is assumed here.
Specify the rule, place, and version
“Delivered price” is too vague to compare. Write the three-letter rule, a named place detailed enough to identify the handoff, and “Incoterms® 2020.” For example, a proposal might say “FCA [agreed dispatch location], Incoterms® 2020” or “DAP [installation-site address], Incoterms® 2020.” Those bracketed places are examples to be completed by the contracting parties, not a claim about EagerLED’s standard terms. This is the first test of whether the LED screen delivery terms in a bid are complete.
According to the International Chamber of Commerce, the rules allocate transport-related obligations, costs, and the point of delivery at which risk transfers. They do not themselves fix the equipment price, payment schedule, title transfer, detailed acceptance test, or remedy for defective goods. Record those matters elsewhere in the contract. LED screen delivery terms should therefore be read with the purchase specification, packing list, insurance arrangement, and service plan.
Ask the seller to identify the legal entity making the offer and the party named as importer of record. An attractive DDP price is of little practical value if the seller cannot legally complete import clearance in the destination market. Conversely, an EXW price may leave a foreign buyer arranging export formalities it cannot easily perform. The ICC notes that FCA is often more practical than EXW for cross-border container or multimodal shipments because export clearance is allocated to the seller under FCA.

Compare LED screen delivery terms on the same handoff
EXW, FCA, DAP, and DDP can all appear in international equipment discussions, but their allocation of work is different. The table is a buyer’s comparison aid, not a substitute for the full ICC text or a country-specific customs review. It intentionally avoids estimated tariffs, because rates and classifications depend on the destination and transaction.
| Rule and practical handoff | Buyer should verify | Quote comparison risk |
|---|---|---|
| EXW, seller’s named premises | Who loads the shipment and can arrange export clearance? | A low equipment price can omit substantial origin and onward costs. |
| FCA, named carrier handoff | Exact handoff location, carrier booking, and onward insurance. | Two FCA offers with different named places are not equivalent. |
| DAP, named destination before unloading | Import clearance, duties, taxes, unloading, and site access. | Arrival at a site does not mean unloading or import charges are included. |
| DDP, named destination | Seller’s ability to import and pay applicable charges; unloading scope. | A headline “all in” claim can conceal exclusions or an impossible clearance plan. |
Under DAP, the seller arranges transport to the named destination while the buyer normally handles import clearance and applicable import charges; delivery occurs before unloading. Under DDP, the seller has the import-clearance and duty obligation, subject to the agreed rule and local feasibility. These are commercial allocations, not a statement that a displayed quote automatically includes every local crane, lift, installation, or commissioning cost.
Do not replace a named Incoterms rule with an informal phrase such as “door to door” or “FOB factory.” Ask for a corrected offer. If a vendor offers ocean-only terms, also check that the proposed rule suits the actual mode and loading point. For containerized or multimodal freight, the ICC’s checklist directs buyers toward FCA rather than assuming FOB applies at an inland handoff. Clarifying LED screen delivery terms before payment avoids trying to solve a handoff dispute after dispatch.
Build a landed-cost worksheet, not a guessed percentage
For each LED screen delivery terms option, begin with the same equipment configuration and packed quantity. Then add only the cost lines the buyer actually bears: origin collection where applicable, main freight, insurance, destination handling, customs broker, import duties and taxes, final delivery, unloading, and on-site installation. A line should say “to be quoted” when no defensible rate is available. Do not fill gaps with a generic percentage from another country.
Keep tax recoverability separate from cash paid at the border. A recoverable tax can still affect project cash flow, while a nonrecoverable duty is a project cost. Ask the import broker to confirm the product classification, documentation, and current local requirements for the actual destination. This article does not assign an HS code or determine whether a specific project qualifies for an exemption.
Freight calculations also need the packed dimensions and gross weight, not only the installed screen area. The site’s shipping-weight guide explains why net, gross, and chargeable weight diverge. The quote-area guide helps separate active display area from cabinets, spares, and other commercial lines. Together they make a transport comparison more defensible without pretending the equipment price is a landed price.

Use a single currency and a stated exchange-rate assumption when comparing offers issued in different currencies. Record the quote date and validity period. If insurance is purchased separately, confirm the insured value, covered transit stages, deductible, claim documentation, and who arranges it. Incoterms obligations do not automatically provide the buyer with the desired insurance protection under every rule.
Identify the LED package and site handoff
Transport responsibility does not answer what is inside the shipment. Ask for a packing list that reconciles cabinet counts, controller and processor equipment, receiving components, power and data cables, mounting parts, and separately purchased spares. Identify which items are factory-installed, packed loose, or supplied by the local installer. A site crew should not discover at unloading that a necessary bracket or cable was excluded from the equipment scope.
Check the destination constraints before requesting a delivered price: truck access, delivery appointment, pallet or case dimensions, dock height, lift equipment, restricted streets, and whether the consignee can receive the freight. For a venue above ground level, delivery to the building entrance and delivery to the installation floor are different tasks. Put the exact receiving point and unloading responsibility in writing, then confirm whether temporary storage is needed.
The installation-cost guide separates structural, electrical, labor, and commissioning work from equipment. Do the same when comparing LED screen delivery terms. An Incoterms rule allocates goods transport and related formalities; it does not turn a shipment into a completed, tested display.

Request a comparison-ready quotation
Send the same request to each seller: destination country and postal address, installation site type, target display size, indoor or outdoor use, viewing distance, preferred cabinet model if known, requested spare kit, and desired delivery window. Ask the seller to return the proposed Incoterms® 2020 rule with named place, itemized equipment scope, packed dimensions and weight, transport and insurance assumptions, exclusions, and quote validity.
Where the buyer has a nominated forwarder, ask for an FCA option at an agreed handoff. Where the seller offers arrival at the destination, request a DAP option and a clear list of buyer-side import and unloading tasks. Request DDP only after confirming local import feasibility with the parties who will actually clear the goods. These are ways to obtain comparable offers, not universal recommendations for every lane.
Frequently asked questions
Does DAP include unloading an LED screen at the venue?
No. Under the standard DAP rule, delivery is at the named place ready for unloading; the buyer normally unloads. If unloading is required from the seller, define a suitable rule or a separate contractual service and confirm equipment, access, and liability.
Does DDP mean installation and commissioning are included?
No. DDP addresses delivery and import obligations for the goods. Structural mounting, power distribution, signal setup, image calibration, and acceptance testing need explicit project-scope lines.
Can we compare an EXW price with a DAP price?
Yes, after adding the buyer’s realistic origin, freight, insurance, destination, import, and local delivery costs to the EXW offer. Record unknown amounts openly; a simple comparison of headline equipment prices is misleading.
Get a quote tied to your real destination
Tell EagerLED the installation country and exact receiving point, screen size, indoor or outdoor environment, viewing distance, planned schedule, and preferred handoff. Ask for LED screen delivery terms stated as a complete Incoterms® 2020 rule and named place, plus separate equipment, packing, freight, spares, and installation assumptions. Send the project requirements through the verified contact page so the offer can be compared with the total work at your site.