    Estimate LED wall heat load from the installed display’s AC input power. If the wall releases its heat into one indoor zone, multiply the representative operating watts by 3.412 to express the contribution in BTU/h. A wall drawing 1,200 W contributes approximately 4,094 BTU/h under that assumption. Send the maximum input figure separately, with the conditions under which it applies.

    For an AV integrator preparing an indoor installation quote, the useful handoff is a short schedule that shows the operating assumptions, the heat released in each space, and the data still needed from the supplier. Facilities can then include the display in the room calculation before the cabinet layout and architectural finish are approved.

    Indoor LED video wall in a conference room
    Illustrative setting Record the room and any equipment closet as separate locations on the heat schedule

    1. What power figure should you use for LED wall heat load?

    Start with the supplier’s AC input power for the cabinet model and pitch in your quote. Ask for a representative figure at the brightness and content you expect to run. If a sheet lists “average” power, ask whether it comes from a measured sequence, a stated test pattern, or an assumed fraction of maximum. These methods can give different answers for the same cabinets.

    For a briefing room that alternates slides and video, describe the white-background material and how long it stays on screen. A demonstration reel can look representative while using less power than a bright dashboard held for an entire shift. Include the luminance target in nits if known and identify scheduled brightness changes. State whether the supplier tested warm, stabilized cabinets at those settings.

    Record the maximum AC input as a separate case. Ask what brightness, test pattern and duration the maximum represents. The electrical designer needs the connected-load information and any relevant startup characteristics. The mechanical designer needs to know whether high-output content can last long enough to affect the room. If typical power is missing, label the operating estimate provisional and request a measured value.

    01. Compare power figures across supplier quotes

    Put competing quotes on the same operating basis before comparing their LED wall heat load. One bidder may quote the complete cabinet at the AC inlet, while another lists the DC output capacity of its internal power supply. The output rating tells you what the supply can deliver. For a supply with a measured AC input and DC output at the same operating point, the difference is the power lost in conversion. A complete cabinet AC input figure already includes that loss when the supply is inside the cabinet.

    Send each bidder the same cabinet layout or active display dimensions, brightness target, and sample content. If they propose a different grid to meet the brief, ask for the resulting wall dimensions and total input. Enter each bid’s confirmed and provisional values in separate fields, so an estimated figure stays visible when purchasing transfers the schedule to facilities.

    How to reconcile power figures in different quotes
    What the supplier provides What to request before comparing How to use it
    Typical watts with the test conditions left blank Measured brightness, example content, and the averaging interval Keep the number provisional until the conditions match the project brief.
    A power supply rating on a component sheet Actual real AC input for the assembled cabinet Record the component rating for reference. Use the assembled cabinet reading in the heat schedule.
    One AC input total for the display and control rack Separate cabinet and rack loads, measured in the same mode Assign each subtotal to its actual location and use the package total as a cross-check.

    The indoor LED screen range can help identify a cabinet family. Request power data for the actual configuration, including the specific revision, once the layout is known.

    2. How to calculate LED wall heat load in BTU/h

    If the quote lists watts per cabinet, multiply by the number of active cabinets. If it lists watts per square meter, multiply by the installed active area in square meters. With mixed cabinets or partial formats, total each cabinet type separately. Use the cabinet drawing to obtain the actual area. The recess opening and trim dimensions belong on the architectural drawing.

    Next, convert each AC power subtotal to a heat-rate estimate. Heat rate (BTU/h) ≈ AC input (W) × 3.412. This screening estimate assumes the input energy ultimately stays as heat in the identified zone. Use project-specific heat rejection data when the manufacturer supplies it. Confirm the boundaries if a power supply sits outside the cabinet or light passes through glazing into another space.

    Take a hypothetical boardroom wall with 20 cabinets, each measuring 0.6 m × 0.3375 m (23.6 × 13.3 in). Assume each draws 60 W in the scheduled presentation mode and 125 W at maximum. The resulting cabinet area is 4.05 m² (43.6 ft²). Assume a separately powered processor draws 100 W and sits in a different conditioned zone. The figures below illustrate the calculation and do not specify an EagerLED product.

    Illustrative equipment heat schedule by location
    Equipment and location AC draw Approximate equipment heat Assumption to verify
    Cabinets in boardroom, presentation mode 20 × 60 W = 1.20 kW 4,094 BTU/h Playback sequence and brightness match normal use
    Same cabinets, maximum condition 20 × 125 W = 2.50 kW 8,530 BTU/h Supplier states the applicable pattern and duration
    Processor in separate AV closet 100 W = 0.10 kW 341 BTU/h Closet has its own zone and processor draw is separate

    The first two rows describe alternative states of the same wall. Use them as separate cases. If the processor moves into the boardroom, the presentation case rises to about 4,436 BTU/h there. The AV closet schedule would then omit the processor. Read the LED electricity cost calculation if the owner also needs to turn that operating profile into a utility budget.

    01. Keep the peak case visible in the schedule

    In the example, presentation mode is 1.20 kW, while the quoted maximum is 2.50 kW. The gap matters if bright content persists during a live event or a maintenance test. Ask the operator how long that mode is likely to run and whether it coincides with a busy room. If the schedule includes recurring bright sessions, request a measurement for that specific mode. A typical figure averaged across the whole day can conceal the period facilities needs to evaluate.

    If a processor, player and network switch share a rack, add each measured AC load in the relevant operating state. For equipment fed through a UPS, identify which readings are upstream and downstream. If the upstream measurement already includes the downstream equipment, adding both totals would double-count that load. Confirm where the UPS losses are released and put them in the schedule for that space.

    Front and rear views of a slim indoor COB LED cabinet
    Use the selected cabinet model and the proposed grid when requesting representative and maximum AC input figures

    3. Where does LED wall heat load go in a recess?

    Map the LED wall heat load to the spaces receiving it. Show the display face, the cavity behind the cabinets, and any rack or closet on the same drawing. A recessed wall can have acceptable room temperature while the cabinet intake sits in a warm pocket. Ask for the permitted operating ambient temperature at the location defined by the manufacturer, plus required clearances and the intended airflow path.

    Coordinate the path before the millwork is released. A grille shown on the elevation tells the reviewer little about where the air enters, where it leaves, or what could block it. Ask the mechanical designer to review how the recess communicates with the conditioned zone or return. Include trim, cross-bracing and cable bundles on the section drawing when they affect the route.

    Mark the location of any remote power supply on the same drawing. For a split system, request a supplier heat breakdown that accounts for the power-supply losses where the supply is mounted and the display load where the cabinets sit. If the cavity exhausts to a return path or a separate space, give that detail to the mechanical designer. Keep the cabinet inlet temperature check in the equipment schedule even when facilities handles cavity and room loads within the same zone model.

    Keep service direction and airflow as separate decisions. A module that comes out from the front can still share a cavity with heat-producing electronics. The EA600COB3 indoor cabinet page shows a front-service configuration and calls for ventilation to be confirmed for the installation.

    Technician using a suction tool to remove an indoor LED module from the front
    Front module access and the air path behind a finished display need their own checks

    4. What to send to facilities before approving the quote

    Submit the LED wall heat load as equipment input to the room design. Include the layout revision, cabinet count, AC input assumptions, applicable operating temperature, and the operating schedule. Attach the section through the recess and identify the zone for each separately powered component. If a figure is still estimated, record who will supply the confirmed value and when that decision is needed.

    Ask facilities to check how the screen’s busy periods coincide with occupancy, lighting, solar gains and the building’s cooling schedule. In a multipurpose room, a bright screen and full occupancy may overlap during presentations. An after-hours display can also keep running when the building changes to setback mode. The complete cooling calculation depends on those conditions and the mechanical system that serves the room.

    01. Assign responsibility for the installation checks

    At bid review, ask the display supplier to confirm cabinet input values and clearances, the AV integrator to verify the installed cabinet and rack schedule, and the mechanical designer to confirm how the room and recess are served. Put those responsibilities in the scope sheet. The quote should also identify who provides any enclosure ventilation and who records temperatures during commissioning.

    Agree on a commissioning check while the trim can still be adjusted. Use the intended brightness and representative demanding content, allow temperatures to stabilize, and have the team record room and cabinet air temperatures at the agreed points. Compare the readings with the limits for the supplied hardware. For related quote scope, see the LED installation budget guide.

    During the check, record the cabinet revision, brightness setting, playback sequence and the power and temperature readings on the same timeline. Capture the room condition as well, including whether the HVAC was in occupied or after-hours mode. A high cavity temperature with normal power points the team toward the air path or local conditions. Readings taken at a different brightness or with the access panels open should be identified before anyone compares them with the agreed operating case.

    Frequently asked questions

    01. Can I use a current reading to calculate LED wall heat load?

    Ask for real AC watts measured at the feed. Multiplying voltage by current gives apparent power in a simple single-phase calculation. Power factor matters when estimating real input watts. Have a qualified person measure the complete load with a suitable meter.

    02. Does a black screen have zero heat output?

    Powered cabinets may still draw energy for their control electronics and supplies while displaying black. For a wall left on overnight, ask for measured black-screen and standby loads and confirm which mode the operating schedule actually uses.

    03. Can a replacement cabinet use the original heat schedule?

    Check the exact revision and input-power data first. Matching pitch and cabinet dimensions do not establish the same power draw or temperature limits. If a quote substitutes a different cabinet, update the equipment schedule before the change is accepted.

    04. Does an indoor LED wall need a dedicated air conditioner?

    Ask the mechanical designer to check the available sensible cooling capacity in the served zone at the time the wall will run. An existing system may have capacity during business hours but provide limited cooling after the building switches to its overnight schedule. A separate equipment closet can also have different operating hours or airflow from the room it serves. Give facilities the running hours for both spaces. The decision depends on the combined load, the design conditions and the ability to keep cabinet inlet temperatures within limits.

    Request power data for your LED wall quote

    To confirm the LED wall heat load for a planned installation, send EagerLED your wall layout and operating requirements. Include the proposed grid, intended brightness, example content, hours of use and a section through any recess. Request the expected operating and maximum AC input for the quoted version, along with documented clearances and temperature limits. With those inputs, your mechanical designer can evaluate the display against the actual room and cooling schedule.